From the Downtown Stocking Stroll to art exhibits (Cult of the Machine) to Better Block’s FabDay digital fabrication challenge, browse our curated selection of events to plan your next week—and beyond.
Included in the first phase of drilling, IAMGOLD-RGM twinned 17 of the 90 historical boreholes with DD holes as part of a due diligence process from October to December 2016. The program aimed to expand the mineralized footprint by testing the continuity along strike at a 50 m by 100 m spacing.
I, as a Qualified Person, am independent of the issuer as defined in Section 1.5 of National Instrument 43- 101. I have not received, nor do I expect to receive, any interest, directly or indirectly, in the Saramacca gold project or securities of IAMGOLD Corporation.
MinEx conducted pit mapping, grab sampling, and pit testing in Koolhoven-Jzone, West Pay Caro, and Rosebel
[A63B] APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT (apparatus for passive exercising, massage A61H)
[G06F] ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
[G01M] TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
The economy of the village remains dependent on the Surinamese coastal economy. Main activities include subsistence agriculture on relatively poor land, small-scale gold mining, forestry, and trade.
There are no records of quality assurance and quality control protocols or performance for exploration work performed by Golden Star and Newmont from 2005 to 2010.
A total of 4,776 samples were sent to IAMGOLDs Rosebel Gold Mine site laboratory for SG determination at Saramacca. SG samples comprise segments of 10 to 20 cm of half core deemed representative of their respective unit. Samples are typically collected every 10 m in soft oxidized material down to the transition zone, and thereafter every 25 m in fresh rock. The frequency may locally increase to cover rapid changes in lithology to ensure all lithotypes are sampled.
SRK Consulting (Canada) Inc., 2014. J-Zone Pit: Geotechnical Slope Designs and Implementation Requirements. Prepared for IAMGOLD Corporation, December 15, 2014.
Once a borehole is complete, a 75 mm by 75 mm wood post is placed into the collar and the collar location is resurveyed. Core is packed in plastic core trays at the drill site.
Piston Slap: W123 Love in 2013? | Din Pn10 Swing Check Valve Related Video:
"Control the quality by the details, show the power by quality". Our enterprise has strived to establish a remarkably efficient and stable team team and explored an effective excellent control system for Poppet Check Valve, Elektrische Absperrklappe, Pneumatic Control Valve, Our company regards "reasonable prices, high quality,efficient production time and good after-sales service" as our tenet. We hope to cooperate with more customers for mutual development and benefits in future. Welcome to contact us.